QUESTION 81 Measuring progress — output method Construction Co lays railroad track and enters into a contract with Railroad to replace a stretch of track for a fixed fee of $ 100,000. All work in process is the property of Railroad. Construction Co has replaced 75 units of track of 100 total units of track to be replaced through year end. The effort required of Construction Co is consistent across each of the 100 units of track to be replaced. Construction Co determines that the performance obligation is satisfied over time as Railroad controls the work in process asset being created. How should Construction Co recognize revenue?