QUESTION 121 Incremental costs of obtaining a contract — construction industry Construction Co incurs costs in connection with winning a successful bid on a contract to build a bridge. The costs were incurred during the proposal and contract negotiations, and include the initial bridge design. How should Construction Co account for the costs?