This course was created with the  Teachable Logo - Dark  course builder. Create your online course today. Start now
Create your course with Teachable Logo - Dark
  Previous Lesson Complete and Continue  

  QUESTION 104 Bill-and-hold arrangement – industrial products industry Drill Co orders a drilling pipe from Steel Producer. Drill Co requests the arrangement be on a bill-and-hold basis because of the frequent changes to the timeline for developing remote gas fields and the long lead times needed for delivery of the drilling equipment and supplies. Steel Producer has a history of bill-and-hold transactions with Drill Co and has established standard terms for such arrangements. The pipe, which is separately warehoused by Steel Producer, is complete and ready for shipment. Steel Producer cannot utilize the pipe or direct the pipe to another customer once the pipe is in the warehouse. The terms of the arrangement require Drill Co to remit payment within 30 days of the pipe being placed into Steel Producer’s warehouse. Drill Co will request and take delivery of the pipe when it is needed.

Lesson content locked
If you're already enrolled, you'll need to login.
Enroll in Course to Unlock